Çevikbaş, M, Okudan, O and Işık, Z (2022) New Delay-Analysis Method Using Modified Schedule and Modified Updated Schedule for Construction Projects. Journal of Construction Engineering and Management, 148(11).

Asghari, V, Wang, Y, Biglari, A J, Hsu, S and Tang, P (2022) Reinforcement Learning in Construction Engineering and Management: A Review. Journal of Construction Engineering and Management, 148(11).

Fathi, M and Shrestha, P P (2022) Public–Private Partnership Project Performance Analysis Compared to Design-Build in Highway Projects. Journal of Construction Engineering and Management, 148(11).

Feng, H, Song, Q, Yin, C and Cao, D (2022) Adaptive Impedance Control Method for Dynamic Contact Force Tracking of Robotic Excavators. Journal of Construction Engineering and Management, 148(11).

Gibson, G E, Sanboskani, H, El Asmar, M and Aramali, V (2022) Employing Technology to Enable Remote Research Charrettes as a Method for Engaging Industry and Uncovering Best Practices: A Novel Approach for a Post-COVID-19 World. Journal of Construction Engineering and Management, 148(11).

González-Cruz, M, Ballesteros-Pérez, P, Lucko, G and Zhang, J (2022) Critical Duration Index: Anticipating Project Delays from Deterministic Schedule Information. Journal of Construction Engineering and Management, 148(11).

  • Type: Journal Article
  • Keywords: Project; Scheduling; Delays; Forecasting; Regression;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002387
  • Abstract:
    Classical scheduling techniques are well-known to underestimate the average project duration, yet they remain widely used in practice due to their simplicity. In this paper, the new Critical Duration Index (CDI) is proposed. This index indirectly allows anticipation for the probability of a project ending late, as well as the average project duration extension compared with a deterministic project duration estimate. The accuracy of two simple regression expressions that use the CDI was tested on two representative data sets of 4,100 artificial and 108 empirical (real) projects. Results show that these regression expressions outperformed the only alternative index found in the literature. Besides allowing enhanced forecasting possibilities, calculating the CDI only requires basic scheduling information that is available at the planning stage. It can thus be easily adopted by project managers to improve their project duration estimates over prior deterministic techniques.

Hajarolasvadi, H and Shahhosseini, V (2022) A System-Dynamic Model for Evaluating the Effect of Person–Team Fit on Project Performance. Journal of Construction Engineering and Management, 148(11).

Hebiba, A M, Bouferguene, A, Moon, S and Han, S (2022) Wind-Wise Automated Stability Analysis for Selection of Tower Crane and Location. Journal of Construction Engineering and Management, 148(11).

Li, L, Luan, H, Yin, X, Dou, Y, Yuan, M and Li, Z (2022) Understanding Sustainability in Off-Site Construction Management: State of the Art and Future Directions. Journal of Construction Engineering and Management, 148(11).

Liu, J, Wang, Y and Wang, Z (2022) Effect of Pressure on Construction Company Compliance Attitudes: Moderating Role of Organizational Ethical Climate. Journal of Construction Engineering and Management, 148(11).

Ma, H, Lv, K, Zeng, S, Lin, H and Shi, J J (2022) Climbing the Pyramid of Megaproject Social Responsibility: Impacts of External Stakeholders and Project Complexity. Journal of Construction Engineering and Management, 148(11).

Moharrami, S, Bayat, A and AbouRizk, S (2022) Modeling Microtunnel Boring Machine Penetration Rate Using a Mechanistic Approach. Journal of Construction Engineering and Management, 148(11).

Sharif, M M, Chuo, S and Haas, C T (2022) Rapid 3D Quality Control in Prefabrication Using a 3D Digital-Templates Framework. Journal of Construction Engineering and Management, 148(11).

Sun, G, Sun, J and Li, F (2022) Influencing Factors of Early Termination for PPP Projects Based on Multicase Grounded Theory. Journal of Construction Engineering and Management, 148(11).

Zuo, F, Zio, E and Yuan, Y (2022) Risk-Response Strategy Optimization Considering Limited Risk-Related Resource Allocation and Scheduling. Journal of Construction Engineering and Management, 148(11).